Our engineering services
| 1.1. PROJECT |
|---|
| Development of projects for metal structures according to European normative references - Eurocode 3 (EN 1993-2) |
| Study and design of functional layouts for process optimization |
| Study and development of special equipment as well as assembly of prototypes for efficient applications |
| Study and design of production lines |
| Preparation of specifications |
| Study, sizing, design and production of solutions and products for the onshore, offshore and metal-mechanical industry sectors |
| 1.2. WELDING |
|---|
| Welding Procedure Qualification |
| Welder Qualification |
| Development and implementation of Work Instructions |
| Preparation of Welding Procedure Specifications (WPS) - Can be done based on customer templates or with custom templates with customer logo |
Our consulting services
| 2. CONSULTING |
|---|
| Support for CE marking certification (EN 3834, EN 1090, ISO 9001) |
| 2.1. WELDING - EN 3834 |
|---|
| Internal audit implementation |
| Process management |
| Definition, elaboration, and implementation of Welding Procedure Qualification Records (WPQR) and Welding Procedure Specifications (WPS) |
| Preparation of inspection procedures |
| Preparation of welding plans |
| Preparation and implementation of work instructions |
| Definition and supervision of Welder Qualifications |
| Preparation of Inspection and Testing Plans |
| Factory control and supervision (on-site or computer-based) |
| Welding coordination |
| 2.2. METAL STRUCTURES - EN 1090 - CE MARKING |
|---|
| Internal audit implementation |
| Process management |
| Definition, elaboration, and implementation of Welding Procedure Qualification Records (WPQR) and Welding Procedure Specifications (WPS) |
| Preparation of inspection procedures |
| Preparation of welding plans |
| Preparation and implementation of work instructions |
| Definition and supervision of Welder Qualifications |
| Preparation of Inspection and Testing Plans |
| Factory control and supervision (on-site or computer-based) |
| 2.3. PRESSURE VESSELS - ASME |
|---|
| Internal audit implementation |
| Process management |
| Definition, elaboration, and implementation of Welding Procedure Qualification Records (WPQR) and Welding Procedure Specifications (WPS) |
| Preparation of inspection procedures |
| Preparation of welding plans |
| Preparation and implementation of work instructions |
| Definition and supervision of Welder Qualifications |
| Preparation of Inspection and Testing Plans |
| Factory control and supervision (on-site or computer-based) |
| Welding coordination |
| 2.4. QUALITY - ISO 9001 |
|---|
| Internal audit implementation |
| Process management |
| Preparation and implementation of documentation control systems |
| Preparation of work instructions |