Facts
Unit with 80 tanks, 17 reactors, automatic filling lines, more than 200 chemicals products and compounds, approximately 25km of piping.
Description
MWS Engineering carried out the engineering process design, execution design and detail of all mechanical systems, storage, reactors and control.
Overview of projects:
– P&ID development;
– 3D modeling of the entire mechanical and storage systems and;
– Elaboration of equipment manufacturing drawings;
– Elaboration of isometrics;
– Elaboration of specifications, calculation notes, etc.;
– Elaboration of the engineering project for execution and detail of the thermal management system;
– Supervision of the thermal management system installation carried out by Pipemasters, Lda.;
– Technical direction of execution, installation, pre-commissioning and commissioning of the unit;
– Manufacturing control and supervision of the tanks and all the equipment;
– Commissioning and unit start-up.